Change Order

A written change to a construction contract’s scope, price or schedule. Owners sometimes ask the design team to pay for change orders they believe a design issue caused.

General definition for education only. It is not an interpretation of any policy or contract, and it is not legal advice. The wording of your own policy and contract controls. Policies and definitions vary by insurance company.

Field notes

What we saw this year

From real claims we handled and our sessions with underwriters. Every client is anonymized.

A claim we handled

Pulled back in through the engineer you hired

3 yearsto close, after mediation and a third-party claim

On a 20,000 square foot office renovation, the architect hired the mechanical engineer as its own sub-consultant. The owner paid about $107,000 in HVAC change orders and sent the demand to the architect, who had hired the engineer. Months of silence angered the owner. A year later the owner sued only the engineer, and the architect was pulled back in through a third-party claim. What helped: a specification requiring shop drawings, and the dispute clause.

If you hire the engineer, the owner sees their mistake as yours. Answer early, even to deny.

Claims and Contract Traps of 2026 webinar, November 2026
Asked and answered

Document every change, paid or not

Asked whether unlimited construction administration hours make tracking pointless, the panel said no: a record of every change, even hundreds of small unpaid ones, is what explains a slipped schedule when a delay claim arrives.

Keep the change log even when nobody is paying for the changes.

Managing Scope Creep webinar, March 2023