Risk Transfer: Hiring Sub-consultants

When you hire the engineer, their mistake can land on you. This series covers what to require from every sub-consultant, how indemnity should flow back to you, and how to pass the owner’s terms down so you aren’t the only one on the hook.

Read by topic →Get the checklist →

For architects, engineers and construction professionals · Hosted by Avi Rabbani, founder of Hardcover · Presented December 2022

$107Kdemanded from an architect over its sub-consultant’s work
3 yrsfor that claim to close
4stages in the hiring checklist
25checks before, during and after the project
Hiring a sub-consultant

Four stages, four sets of checks

Use the full checklist every time you bring a structural, civil, MEP or other consultant onto a project.

  1. Before you sign

    Read your client contract first, write the sub’s scope, get a certificate and a written agreement.

  2. Before work starts

    Certificate on file, renewal dates on the calendar, a signed copy you can find later.

  3. During the project

    Review work at handoff points, coordinate drawings, track change orders, report problems early.

  4. After the project

    Keep the records, and confirm the sub keeps coverage for the agreed years.

  5. Next time

    Note what to change in your sub-consultant agreement.

To the owner, your sub-consultant’s mistake is often your mistake. The paper between you and your sub decides who ends up paying.
The demand letter went to the architect. The ductwork was the engineer’s. The owner billed the firm that hired them.The change order claim from our 2026 webinar, in three sentences
When the sub gets it wrong

What happened, and what helped

Real claim, 2026

The change orders nobody would pay

$107Kdemanded from the architect, about three years to close

An architect hired the mechanical engineer as its own sub-consultant. Ductwork ran into ceilings and steel, and the owner demanded the cost of the change orders from the architect. A spec requiring shop drawings and a mediation clause helped. Months of silence made the owner angrier.

Answer early, even to deny. And keep the paper that shows who was responsible for what.

Example

The sub with no insurance

Picture an engineer you hired whose design doesn’t meet an accessibility requirement. The owner demands a fix, and the engineer has no professional liability policy. The claim lands on you.

No certificate, no start date.

Your sub-consultant agreement

Five gaps, and how to close them

Examples only. Your attorney should draft the agreement.

Gap · PaperworkA handshake deal or a one-line email
Close it withA written sub-consultant agreement, signed before work starts
Gap · InsuranceNo certificate on file
Close it withA current certificate with limits that match your client contract, and renewal dates tracked
Gap · IndemnityNothing about who pays if the sub is at fault
Close it withIndemnity to the extent caused by the sub’s negligence
Gap · Owner’s termsThe owner’s requirements stop with you
Close it withA pass-through clause so the sub takes on matching terms
Gap · After completionThe sub’s coverage can lapse when the job ends
Close it withCoverage kept in place for a set number of years
Read by topic

5 short episodes, one topic each

This session wasn’t recorded for the site, so each topic is written up as its own short article. Start anywhere.

  1. When you hire the engineer, their mistake is yours

    Vicarious liability in plain words, with a real claim from this year.

    Article coming soon
  2. What to require from every sub-consultant

    Certificates, limits and coverage that lasts after the project ends.

    Article coming soon
  3. Indemnity that flows back to you

    The sub’s contract should protect you the way the owner asks you to protect them.

    Article coming soon
  4. Pass-through clauses and matching terms

    Flow the owner’s requirements down to your consultants.

    Article coming soon
  5. Checklist: hiring a sub-consultant

    Before you sign, before work starts, during the project and after.

    Article coming soon
Free checklist

Checklist: Hiring a Sub-consultant

Use this every time you bring a structural, civil, MEP or other consultant onto a project: before you sign, before work starts, during the project, and after it ends.

Open the full checklist →

Before you sign

  • Read your client contract’s insurance, indemnity and consultant sections first.
  • Confirm the sub-consultant is licensed for the work in the project’s state.
  • Write down the sub’s scope: what’s included and what isn’t.
  • Get a current certificate of insurance. Check the firm name, policy dates and limits.
  • Confirm their professional liability limits fit the project and meet your client contract.
Takeaways

Three things to take with you

01

You may be responsible for the consultants you hire.

To the owner, your sub’s mistake is often your mistake.

02

Require insurance before work starts.

A certificate, limits that fit the job, and coverage that stays in place after the project.

03

Make the sub’s contract match yours.

Pass the owner’s requirements down, with indemnity tied to their negligence.

Hardcover’s founder, a Licensed Insurance Agent. Stories are anonymized. This is risk management information, not legal advice; coverage depends on the terms of your own policy, and your attorney should review any contract before you sign it.