Deal Makers and Deal Breakers

Choosing the right clients and projects does more to prevent claims than any clause or policy. This two-part workshop walked through a go or no-go process for the client, the project, the contract, the money and insurance, and your own team.

Read by topic →Get the checklist →

For architects, engineers and construction professionals · Hosted by Avi Rabbani, founder of Hardcover · Presented February 2025

5areas to check: client, project, contract, money, team
9deal breakers that should stop a deal
8clauses worth asking for in every agreement
27yes or no questions in the free checklist
The decision

Five areas to check before you say yes

Most firms already have a go or no-go process. It usually lives in one principal’s head. Writing it down makes it faster, consistent and easier to hand to project managers.

  1. The client

    Experience, reputation, realistic expectations, and whether they pay their designers.

  2. The project

    Funding, approvals, delivery method, and a design contingency for normal fixes.

  3. The contract

    Indemnity, the duty to defend, a liability cap, dispute steps and termination terms.

  4. Money and insurance

    A fee that covers the work, and insurance requirements you can actually meet.

  5. Your team

    The experience, the staff and the sub-consultants to do it well and on time.

Check the deal breakers first. A good score on everything else never overrides one.
The cheapest claim is the one that comes from a project you never took.The idea behind the whole workshop
What a bad yes looks like

Four warning signs, and what they cost

Two of these are real claims from 2026. The other two are examples of the pattern.

Real claim, 2026

The fee fight that cost more than the fee

$35Kin defense so far, over a $10,000 retainer

A client who stopped paying became a client who sued. The architect’s award was thrown out because her contract required mediation first, and the counterclaim followed.

A client who won’t pay at the start rarely gets easier.

Real example, 2026

The insurance page that cost more than the job

$17,500fee on a project that asked for a $5 million limit

Raising the firm’s limit to meet the requirement would have cost about $10,000 a year, more than half the fee, before anyone drew a line.

Price the insurance before you price the fee.

Example

The project with no funding

Picture an owner who needs permit drawings to close on financing, and can’t pay until the loan closes. If the loan never closes, the drawings are done and the invoice is never paid.

Ask who is paying, and when, before you start.

Example

The builder’s contract sent to a designer

Picture a contract that talks about labor, materials, cleanup and workmanship. It wasn’t written for design work, and fixing it line by line rarely works.

Start over from an agreement written for design professionals.

Deal breakers

Seven clauses that should stop a deal, and what to ask for

If the client won’t change these, the safest answer may be to walk away. Examples only; have your attorney review the final wording.

Deal breaker · Duty to defendYou “defend, indemnify and hold harmless” the owner from all claims
Ask for insteadNo duty to defend; indemnity only to the extent caused by your negligence
Deal breaker · GuaranteesYou guarantee, warrant or certify a result
Ask for insteadThe ordinary standard of care for your profession and area
Deal breaker · Job-site safetyYou supervise the contractor or answer for site safety
Ask for insteadSafety and means and methods stay with the contractor
Deal breaker · Liquidated damagesA set penalty if the schedule slips
Ask for insteadRemove it, or limit damages to proven negligence
Deal breaker · AssignmentThe owner can hand your contract to anyone
Ask for insteadNo assignment without your written consent
Deal breaker · Insurance you can’t buyAdditional insured on your professional liability, or limits out of proportion
Ask for insteadRequirements that match what the market offers for this job
Deal breaker · Stop-work authorityYou can halt the contractor’s work
Ask for insteadNo stop-work authority for the design team
Read by topic

9 short episodes, one topic each

This session wasn’t recorded for the site, so each topic is written up as its own short article. Start anywhere.

  1. Why saying no is risk management

    The mistakes behind most design firm claims start at the proposal stage.

    Article coming soon
  2. The five areas of a go or no-go decision

    Client, project, contract, money and insurance, and your team.

    Article coming soon
  3. Is this client a good fit?

    Reputation, realistic expectations, and clients who don’t make the last payment.

    Article coming soon
  4. Is this project real?

    Funding, approvals, delivery method, and why you shouldn’t start work for free.

    Article coming soon
  5. Seven contract clauses that should stop a deal

    What each one does and the edit to ask for.

    Article coming soon
  6. Eight clauses to ask for in every contract

    The terms worth having in every agreement you sign.

    Article coming soon
  7. Insurance deal breakers and deal makers

    Requirements that aren’t tied to negligence, limits out of proportion, and what helps.

    Article coming soon
  8. Can you make money and staff it?

    Fee, competition, staffing and the rest of the design and build team.

    Article coming soon
  9. Build your own go or no-go checklist

    A checklist you can adapt and use on your next proposal.

    Article coming soon
Free checklist

Go or No-Go Checklist for Design Firms

A one-page checklist turns the decision to take a project into something your whole firm can use the same way every time. Check for deal breakers first, then answer yes or no across five areas. A “yes” is the good answer. Adapt it to your firm.

Open the full checklist →

Step 1. Deal breakers

  • The client won’t sign a written agreement before work starts.
  • The contract has you guarantee, warrant or certify a result beyond the standard of care, and the client won’t change it.
  • The contract has you “defend” the client, or indemnify for things you didn’t cause, and the client won’t change it.
  • The contract puts job-site safety or supervision of the contractor on you.
  • The contract has liquidated damages or stop-work authority the client won’t remove.
Takeaways

Three things to take with you

01

Every claim starts with a yes.

A written go or no-go process makes it easier to say no early, and to say it the same way every time.

02

Know your deal breakers before the contract arrives.

Broad indemnity, guarantees, job-site safety and insurance you can’t get are reasons to push back or walk.

03

Ask for the clauses that protect you.

A cap, a mutual waiver of consequential damages, mediation first and clear termination terms.

Hardcover’s founder, a Licensed Insurance Agent, as a workshop presenter. Stories are anonymized. This is risk management information, not legal advice; coverage depends on the terms of your own policy, and your attorney should review any contract before you sign it.

Talk to a specialist

Have a contract on your desk, or a letter you’re not sure about?

Send it over. We’ll tell you what the insurance section asks for and what your policies already do. Insurance guidance, not legal advice.