10 Questions Answered: Managing Scope Creep

What attendees asked during the session, and what the risk manager and underwriter said. The short answer comes first. General information for architects, engineers and construction professionals, not legal advice.

Contracts and scope 6

Asked live · 15:28 in the recording

Can I list the specific codes I'll follow instead of agreeing to meet all codes?

The panel leaned toward keeping code language broad.

The panel leaned toward keeping code language broad. Hardcover's founder noted that codes change often, in some states every couple of years or after a major storm, so a fixed list can go out of date. A carrier risk manager added that not every code is completely clear, and a flat promise to comply can be used against you later. The middle ground discussed was agreeing to do your best to comply, rather than a 100% contractual guarantee. And if you know a design won't meet code, the advice was not to go ahead just because the client asks.

Link to this answer

Asked live · 44:05 in the recording

Small requests keep turning into a lot of extra work. Is it fair to ask for more fee?

The risk manager said the contract governs this, so the key is getting changes written into it.

The risk manager said the contract governs this, so the key is getting changes written into it. Not every small change has to trigger a new fee. A contract can set a level of change that does, which protects you from slow, steady scope growth without seeming to nickel-and-dime the client. When the project becomes more complex or time-consuming, or needs another round of drawing changes, you should have a written way to raise your fee. He noted that unknowns, such as soil problems found mid-project, can change an entire job.

Link to this answer

Asked live · 50:41 in the recording

Should we document every out-of-scope change, even with unlimited construction administration hours?

Yes.

Yes. The risk manager said to document all changes, whether or not you're paid for them. If you later face a delay claim, a record showing, for example, 800 changes during the project can help explain why the schedule slipped, even if none of them earned an extra fee. He also suggested talking with the owner each time a change comes up and making sure it's all well documented. Unlimited hours in the contract don't change the value of the record.

Link to this answer

Asked live · 46:24 in the recording

Our projects keep pausing for 2 to 6 months and restarting. Is a restart fee typical?

The panel said stop-and-start projects are very common and are leading to claims.

The panel said stop-and-start projects are very common and are leading to claims. Owners run out of funding, ownership changes, or a new design team comes in, and when work resumes the owner may argue that the delay cost them money. The panel didn't name a standard restart fee. The advice centered on the contract: build in the right to adjust fee and schedule when the project changes, and keep a written record of every pause and change so you can show why time was lost.

Link to this answer

Asked live · 48:30 in the recording

An owner fired the last architect and wants us to finish from the existing drawings. What should we watch for?

The risk manager said he doesn't like this setup.

The risk manager said he doesn't like this setup. Picking up another firm's drawings is like editing an article someone else wrote: errors can be harder to spot than if you started from scratch, and owners often ask because they don't want to pay for a new set. At the least, get written language saying you aren't relying on the accuracy of the earlier drawings. Even then, you're still buying risk. You may be pulled into a lawsuit and have to use that clause as a defense to get out. Weigh what you're being paid against that risk.

Link to this answer

Asked live · 63:57 in the recording

Bids came in over budget. How do we make sure the client pays for redesign?

The risk manager said this comes down to what you agreed to up front.

The risk manager said this comes down to what you agreed to up front. If you already committed to a contract and a fee and the numbers come in higher than expected, the extra work can leave you underpaid; that's the risk of not having pricing settled when you signed. For construction pricing, he said the better setup is for the owner to contract separately with the contractor, so cost overruns are the owner's problem rather than the designer's. He noted that cost overruns have led to claims.

Link to this answer

Liability caps 2

Asked live · 28:26 in the recording

If my contract caps liability at my fee, won't a claimant just go after my insurance anyway?

The risk manager disagreed with the idea that a cap is just a starting point.

The risk manager disagreed with the idea that a cap is just a starting point. A signed limitation of liability clause is a written contract defense, and he called it very powerful in defending a case. A claimant can still demand more, but they then have to prove why the clause shouldn't apply, which he described as a hard road. Hardcover's founder added that defense time and cost, more than the final payment, are often the biggest part of a claim, so a cap can help keep a case in proportion to a small fee. Whether a cap holds may depend on your state.

Link to this answer

Asked live · 31:04 in the recording

My cap was "$100,000 or my fee, whichever is less." The client changed it to "whichever is more." Is that a problem?

Yes, that change matters.

Yes, that change matters. The risk manager said he wouldn't want "whichever is more," because the larger number will always apply, so the clause limits very little. He agreed with the attendee's attorney that a cap set unreasonably low may not be enforced, and noted caps aren't enforceable everywhere, which is why working with a local attorney matters. His suggestion was a fixed number that could be seen as reasonable where you work, as low as you can get the owner to sign.

Link to this answer

Pools and specialty items 2

Asked live · 59:16 in the recording

My cap is my design fee. What if I'm pulled into a bodily injury suit over a pool in my design?

The underwriter said that even if you only designed the pool on paper and the client signed off, you can be brought into a suit because you designed or specified it.

The underwriter said that even if you only designed the pool on paper and the client signed off, you can be brought into a suit because you designed or specified it. Your design may have no fault, but your insurer may still have to defend you, and that defense cost can use up your limits whether or not you have a liability cap. The panel's advice was to weigh whether that part of the work is worth it, especially without pool experience, and have the client hire a pool specialist directly. Subject to policy terms.

Link to this answer

Asked live · 62:20 in the recording

Can we leave space for a pool and have the pool contractor design it?

Yes, but how you set it up matters.

Yes, but how you set it up matters. The underwriter said not to hire the pool designer as your own subconsultant, because that keeps you in the chain and you can still be brought in. Have the client contract with the pool professional directly. The risk manager added that if you choose where the pool goes, you still carry some liability if it ends up in the wrong spot or doesn't meet code, even if you didn't design the pool itself. The more of the work you take on, the more risk you carry.

Link to this answer

Did we miss your question? Email webinars@hardcoverins.com and we will answer it.