The Change Orders Nobody Would Pay. When Your Sub-Consultant’s Mistake Is Yours

Short answer

An architect hired the mechanical engineer as his own sub-consultant. When the ductwork clashed with the building, the owner demanded about $107,000 from the architect, not the engineer. A sub-consultant mistake often lands on the firm that holds the contract, and a clear specification plus a dispute clause helped this architect. Months of silence made things worse.

Why the owner went after the architect

The project was a 20,000-square-foot office renovation. The ductwork ran into ceilings and steel beams, and the rooftop ductwork had so many turns that the system kept overheating.

Change orders followed, and the owner demanded about $107,000 in total. The letter went to the architect because he held the contract with the owner.

“My engineer will handle it”

The architect hesitated to report, since the engineer was responsible for the design. Avi told him it looked like a claim and he should report it, and he pushed back at first.

The letter was addressed to him, and he had hired the engineer, so he reported. A sub-consultant mistake can become your claim even when the error was never yours.

What helped

The architect replied the same day that the HVAC contractor never submitted the shop drawings the specifications required. Denying liability was fair, since the shop drawings pointed at the contractor.

His contract also had a dispute clause. Defense counsel credited that clause when the owner later sued only the engineer.

What hurt

The owner’s calls went unanswered for months. A few months in, the carrier told the owner it would not make an offer, and the silence angered the owner.

The HVAC contractor offered about $30,000, and the owner wanted the rest from the design team. The architect’s position was a denial of liability. The owner demanded mediation, and a defense lawyer was assigned.

A year later, the owner sued only the engineer. Five months after that, a third-party claim pulled the architect back in. The firm paid a $2,500 deductible, and the matter took about three years to close.

What to check with every sub-consultant

  • Ask for their professional liability certificate and limits.
  • Ask for indemnity back to you for their work, and review the wording with your attorney.
  • Require shop drawing review in your specifications.
  • Include a dispute clause in your own contract.
  • Answer early when an owner raises a problem, even if you plan to deny it.

This is risk management information, not legal advice. Talk to your attorney about a specific contract.

Am I responsible for my sub-consultant’s mistakes?

Often the owner looks to the firm it contracted with, which may be you. Your contract, the facts and your policy terms decide the outcome. Being named is different from being found responsible.

What should I ask for from a sub-consultant before hiring?

Ask for proof of professional liability insurance and the limits. Ask whether the agreement includes indemnity back to you. Check that they will notify you promptly of any claim or circumstance.

If this is happening now

Report it before you respond.

If a client has complained, sent a letter or mentioned a lawyer, call us before you reply. Most policies ask for prompt notice.

For your firm

Written for This Specialty.

How coverage works for each kind of firm, what underwriters ask, and the claims that come up.

This article is general information, not insurance or legal advice. Coverage depends on the terms, conditions and exclusions of your policy as issued.