Restaurant build-outWater intrusion, and a builder’s demand
$41K$21K defense + $20K settlement, 16 months
Three months after opening, water was getting in. Years later the builder demanded the architect defend it and cover its costs. The firm reported to both its professional and general liability carriers and, within two weeks, sent a written project history with dates and photos. That memo became the backbone of the defense. The firm still paid a $15,000 deductible.
Facts, dates and photos win. Opinions and apologies do not.
Sole practitioner, custom homeA fee dispute that bit back
$35Kin defense costs so far, on a fee fight still open
After a $10,000 retainer, the client stopped paying. The architect won about $18,000 in arbitration, but a court threw out the award because her contract required mediation first and she skipped it. Her carrier could not fund the collection, since chasing your own fee is not a professional error. The clients then sued for breach of contract and fraud and filed a licensing board complaint, which closed with no violation. The other side later offered a walk-away, with the fee never paid; it was declined, and the claim is still open.
Follow your contract’s dispute steps in order, and expect a counterclaim before you chase a fee.
Office renovationPulled back in through a sub-consultant
3 yearsto close, after mediation and a third-party claim
The architect hired the mechanical engineer as its own sub-consultant. After an HVAC complaint, the owner sued the engineer, and the architect was pulled back in. What helped: a specification requiring shop drawings and a dispute clause. What hurt: months of silence that angered the owner.
Silence makes claims worse. Answer early, even to deny.
One-person engineering firmReported early, before any demand
Circumstancelogged, not a claim, and dated the day he reported
A client complained a wind load report did not cover enough, and he pointed to his written scope. Later he heard the report might come up in his client’s lawsuit, and reported it at renewal. The carrier logged a circumstance, not a claim, so any later claim counts as made the day he reported it.
Report early. It protects you and does not count against you.