Data centers by the numbers: what is driving the work
Construction spending, electricity demand and capital budgets all point the same way. Here is what the primary data says, where the work is going, and what it means for an engineering or design firm deciding how much of it to take on.
Six numbers that explain the market
About $45 billion a year
The annual rate of US data center construction spending in December 2025, almost 30% above a year earlier, from the Census Bureau’s detailed spending file.[1][2]
4.4% of US electricity
What data centers used in 2023, about 176 TWh, according to Berkeley Lab’s 2024 report for the Department of Energy.[3][4]
6.7% to 12% by 2028
Berkeley Lab’s projected range for the data center share of US electricity, or 325 to 580 TWh.[3][4]
About $650 billion
What the four largest US tech companies forecast for 2026 capital spending, mostly data centers and the equipment in them, as reported by Bloomberg.[8]
10,903 MW
Supply in the primary North American data center markets in the first half of 2026, up 33.7% in a year, per a broker’s market report.[10]
0.2% vacancy
Northern Virginia’s data center vacancy in the same broker report: there is almost nothing empty to lease.[10]
The spending is real, and it is hiding in the office line
The Census Bureau’s monthly construction spending release does not have a headline line for data centers. They sit inside the office category, and the detailed data file splits office spending into general, data center and financial.[1][2] By December 2025 that data center line was running at an annual rate of about $45 billion, almost 30% above the year before, in a year when total US construction spending fell about 1.4%.[2]
Construction starts tell the same story. Dodge Construction Network said data centers, along with nonbuilding work, were the main engine of growth in 2025. In October 2025 alone, ten projects valued at $1 billion or more broke ground, largely data centers, manufacturing and LNG.[9]
Behind the construction is the money. Bloomberg reported in February 2026 that the four largest US tech companies forecast about $650 billion of capital spending for the year, mostly on data centers and the equipment inside them, and that they were already competing for finite crews of electricians and cement trucks.[8] Those are company forecasts reported by the press, and they change with every earnings call.
What is driving it: AI, cloud, and the power to run them
Berkeley Lab’s 2024 report, written for the Department of Energy, found US data centers used about 176 TWh in 2023, 4.4% of the country’s electricity, up from 58 TWh in 2014. It projected 325 to 580 TWh by 2028, or 6.7% to 12% of US electricity.[3][4]
Globally, the International Energy Agency put data center use at about 415 TWh in 2024 and projected about 945 TWh by 2030, with artificial intelligence as the main driver. The US was the largest user, about 45% of the world total, and the IEA expected US data center use to grow by up to 240 TWh, about 130%, from 2024 levels.[5]
For a design firm, the electricity numbers matter more than they first appear to. Power, not land or steel, is what limits where these buildings go. A broker’s market report for the first half of 2026 named power availability and delivery timelines as the main constraints on siting, with community acceptance now close behind.[10] We cover what that means for engineers in power, generation, batteries and water.
The work follows the grid
Northern Virginia is still the center of the market. Virginia’s legislative research commission, JLARC, found that unconstrained data center growth could raise the state’s electricity use 183% by 2040, against about 15% without new data center demand, and that the state would not produce enough power to support that growth at current rates.[11]
CBRE, a commercial real estate broker, put Northern Virginia’s vacancy at 0.2% in the first half of 2026. Across the primary markets it tracks, about 7,481 MW was under construction and 80.4% of it was already leased before completion.[10] When space is leased before it is built, the tenant’s go live date becomes part of everyone’s contract.
Our practical view: firms based near the established markets see the most work, but many projects now land wherever a utility can deliver power, which means engineers working in states and jurisdictions where they have never been licensed or done business.
What it means for design and engineering firms
Our practical view, from placing coverage for engineering and technical firms. None of this changes what a policy covers, which always depends on its wording and the facts.
Bigger projects, sooner
A single campus can be one of the largest jobs a 40 person MEP firm has ever had. Your share of fees from one client can jump in a year, and carriers ask about that concentration.
New kinds of clients
Hyperscalers, colocation developers, utilities and private equity backed builders all buy design differently. Many arrive with their own contract forms and their own insurance schedules.
Higher limits asked
Large owners often ask designers for limits well above what a firm of your size carries. That is a conversation to have before the proposal, not after the award.
Speed as a requirement
Owners racing for capacity compress design and construction. Fast tracking creates coordination gaps, which is where many design claims start.
More scrutiny on power
Power availability now drives where projects go. Engineers who design substations, generation or batteries take on exposures most building engineers have not had.
What the numbers do not tell you
Forecasts for the same thing disagree widely. Berkeley Lab’s own 2028 range runs from 325 to 580 TWh, a spread of almost 80%.[4] EPRI’s 2024 study put data centers at roughly 4.6% to 9.1% of US electricity generation by 2030 across four scenarios.[6] Its 2026 update raised that to 9% to 17% by 2030, with a range about 60% higher than its earlier scenarios.[7] The IEA itself stresses large uncertainties, from the economy to how quickly AI is adopted.[5]
The numbers also do not tell you which projects will be built. Dodge suggested data center starts could cool, at least relatively, in 2026,[9] and capital spending forecasts are company guidance, not signed contracts.[8] Vacancy and leasing figures come from brokers that earn fees in the market they describe.
Three questions to ask before you plan around a forecast:
- Who published it, and do they sell into this market?
- Is it spending, starts, announced projects or electricity use? They are different measures.
- Is it a range? If so, plan for the low end and price for the high end.
Taking on your first data center?
Tell us the client, the contract and the fee. We will tell you what carriers will ask and whether your limits fit.
The data center market, in plain words
How big is data center construction in the US?
The Census Bureau’s detailed construction spending file showed data center construction at an annual rate of about $45 billion in December 2025, almost 30% higher than a year before. It sits inside the office category in the main release, so it is easy to miss.
Why is everyone building data centers now?
Mainly artificial intelligence and cloud computing. The International Energy Agency expects electricity demand from AI optimized data centers to more than quadruple by 2030, and the four largest US tech companies forecast about $650 billion in 2026 capital spending, mostly on data centers.
Where is the work?
Northern Virginia is the largest market and is almost full: one broker’s report put its vacancy at 0.2% in the first half of 2026. Power availability is now the main factor in where new projects go, so sites follow the grid.
Will the boom last?
Nobody knows. Forecasts of data center electricity use for the same year differ by a factor of two or more, and Dodge Construction Network suggested data center starts could cool, at least relatively, in 2026. Plan your firm so one cancelled campus does not hurt it.
What does this mean for my insurance?
Larger projects, new clients and higher limit requests. How your policy responds depends on its wording and the facts, so tell your broker about data center work before you sign the contract, not at renewal.
Keep reading
- Insurance for data center projects
- The firms that design and build data centers, and what each risks
- Power, generation, batteries and water: the new exposures
- Speed to power: schedule pressure and delay claims
- The clauses in hyperscaler and colocation contracts
- Practice policies, project policies and limits on large projects
- Electrical engineers and MEP engineers
Sources
- US Census Bureau, Construction Spending (Value of Construction Put in Place)
- Marketplace, “Data center construction up nearly 30% in 2025, with limited impact on GDP” (February 2026)
- Lawrence Berkeley National Laboratory, 2024 United States Data Center Energy Usage Report (LBNL-2001637)
- Berkeley Lab, “Berkeley Lab Report Evaluates Increase in Electricity Demand from Data Centers”
- International Energy Agency, Energy and AI (2025), as summarized by DatacenterDynamics
- Utility Dive, on EPRI’s 2024 Powering Intelligence study (EPRI is a utility funded research institute)
- EPRI, Powering Intelligence 2026: Updated Scenarios of U.S. Data Center Electricity Use
- Data Center Knowledge, “Big Tech to Spend $650B This Year as AI Race Intensifies” (Bloomberg, February 2026)
- Construction Dive, on Dodge Construction Network’s 2025 construction starts (Dodge is a construction data company)
- CBRE, North America Data Center Trends H1 2026 (a commercial real estate broker)
- Cardinal News, on the Virginia JLARC report “Data Centers in Virginia” (December 2024)
General information only, not legal advice, current as of November 2026. Market figures and forecasts change often; check the source before relying on a number. Whether a claim is covered depends on the facts and your actual policy wording.
Tell Us About Your Firm. We’ll Tell You What We See.
Starting out or renewing, with a policy in hand or not. If something is worth discussing, we’ll call. If not, we’ll say so.