When an owner fires one designer and asks you to finish with the existing drawings, you take on risk you didn’t create. A written clause saying you aren’t relying on the earlier drawings helps, but you may still be pulled into a lawsuit. Price and decide with that in mind.
Why owners ask you to finish another firm’s work
Hardcover’s founder said clients often call about this. The owner fired the architect, or the project was delayed or changed. Now the firm is the lead, with drawings someone else made. They want to know what to do, and whether to sign and seal.
A carrier risk manager on our panel said owners often don’t want to pay for a new set of drawings. So they ask the new firm to work from the old one. He said this is extremely common right now and a realistic risk. It often follows one of the projects that stop and start.
Why it can be harder than starting fresh
The risk manager said he doesn’t like replacing another design professional and using their materials. He compared it to editing an article someone else wrote. Sometimes that is harder than writing it from scratch.
He said it can be harder to spot errors in finished drawings than to create the drawings yourself. You didn’t make the early choices, and you may not know why they were made. Mistakes can hide in details that look complete.
There is also the question of why the first firm left. A firing, a dispute over fees or a stalled project can all leave loose ends. You may be stepping into an argument that started before you arrived.
Get the “not relying on prior drawings” clause
At the least, he said, get something in writing that says you aren’t relying on the accuracy of the earlier drawings. This is sometimes called a reliance clause. It puts on record that the earlier work came from the earlier firm.
That clause is worth having. It gives you a written defense if the old drawings turn out to be wrong. Our page on taking over another architect’s project covers more of the insurance side.
Why you can still be pulled into a lawsuit
Even with that clause, the risk manager said you are still buying risk. If something goes wrong, you may be dragged into the lawsuit anyway. Then you have to use the contract language as a defense to get out. That takes time and money, even when the clause works.
Picture this. You finish a building from a fired firm’s drawings. A problem shows up after construction. The owner sues everyone who touched the design, including you. Your clause helps you argue your way out, but only after you are already in the case.
Questions to ask before you say yes
This list is Hardcover’s own, not the panel’s. Work through it before you agree to take over:
- How much of the existing design will you change, and how much will you keep?
- Is your fee enough to check the old drawings properly?
- Does your scope say what you are and aren’t responsible for?
- Will the owner sign a clause saying you aren’t relying on the prior drawings?
- Are you being asked to sign and seal work you didn’t prepare?
It comes down to your appetite for risk
The risk manager said the decision comes down to your firm’s appetite for risk and how much you are being paid. Some firms take these jobs and price them for the extra checking. Others pass.
Either choice can be a sound one. What matters is that you make it on purpose, with a clear scope and a fee that pays for the extra review.
On sealing work you didn’t prepare, talk with your attorney and your agent before you decide. For a related story, read about stamping someone else’s design. If the job looks wrong from the start, see the job worth walking away from.
Someone else’s drawings come with someone else’s risk, and a clause only helps after you’re in the case.
Common questions
Can I protect myself with a contract clause?
A clause saying you aren’t relying on the earlier drawings helps. You may still be named in a lawsuit, and then the clause becomes your defense to get out.
Should I sign and seal drawings I didn’t prepare?
Talk with your attorney and your agent first. The panel advised caution about taking on another firm’s work, and the answer depends on your contract and the project.
This is risk management information, not legal advice. Have your attorney review any contract before you sign. This article is general information, not insurance or legal advice. Coverage depends on the terms, conditions and exclusions of your policy as issued, and every firm’s price is set by the insurer on its own facts.